I just had a talk with Sava. The next Campcaster release, formerly
known as 1.1.2, will become 1.2 and the deadline is January 15th. This
deadline is imposed from the outside (Sava or Doug will fill us in on
the details of that), so anything extra needs to be cut. The main
change is that RDS and single sign-on (with Campsite) needs to be
implemented. Sorry for this sudden change - yell at Sava for that one.
Mark: is it possible to move to gstreamer-0.10 by then? Please look for
any way you can do this by that deadline (cutting out optimizations for
SMIL or other things - just bare-bones if need be).
We're going to use the czech RDS hardware for RDS.
I've moved a bunch of things out of the release to allow for extra time
to implement the extra features.
I just had a talk with Sava. The next Campcaster release, formerly
known as 1.1.2, will become 1.2 and the deadline is January 15th. This
deadline is imposed from the outside (Sava or Doug will fill us in on
the details of that), so anything extra needs to be cut. The main
change is that RDS and single sign-on (with Campsite) needs to be
implemented. Sorry for this sudden change - yell at Sava for that one.
Mark: is it possible to move to gstreamer-0.10 by then? Please look for
any way you can do this by that deadline (cutting out optimizations for
SMIL or other things - just bare-bones if need be).
We're going to use the czech RDS hardware for RDS.
I've moved a bunch of things out of the release to allow for extra time
to implement the extra features.
I just had a talk with Sava. The next Campcaster release, formerly
known as 1.1.2, will become 1.2 and the deadline is January 15th. This
deadline is imposed from the outside (Sava or Doug will fill us in on
the details of that), so anything extra needs to be cut. The main
change is that RDS and single sign-on (with Campsite) needs to be
implemented. Sorry for this sudden change - yell at Sava for that one.
Mark: is it possible to move to gstreamer-0.10 by then? Please look for
any way you can do this by that deadline (cutting out optimizations for
SMIL or other things - just bare-bones if need be).
We're going to use the czech RDS hardware for RDS.
I've moved a bunch of things out of the release to allow for extra time
to implement the extra features.
I have tightened the deadline for the purposes of the radio package
implementation. If something has to be cut, we'll cut it to meet the
deadline. The features that are cut now will be pushed over to the next
release. So ultimately we will get there. I wish it were otherwise, but
reality is such.
Happy holidays.
Sava
"Robert Klajn"
12/21/06 11:52 AM
Please respond to campcaster-dev
To:
cc:
Subject: RE: [campcaster-dev] Next release: change of plans
"..., so anything extra needs to be cut. ..."
I listen that music from September . Nice !
Really. What we create ?
I just had a talk with Sava. The next Campcaster release, formerly
known as 1.1.2, will become 1.2 and the deadline is January 15th. This
deadline is imposed from the outside (Sava or Doug will fill us in on
the details of that), so anything extra needs to be cut. The main
change is that RDS and single sign-on (with Campsite) needs to be
implemented. Sorry for this sudden change - yell at Sava for that one.
Mark: is it possible to move to gstreamer-0.10 by then? Please look for
any way you can do this by that deadline (cutting out optimizations for
SMIL or other things - just bare-bones if need be).
We're going to use the czech RDS hardware for RDS.
I've moved a bunch of things out of the release to allow for extra time
to implement the extra features.